(Monday, September 27)
(Monday, September 27)
Line 23: Line 23:
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
 
# Issues
 
# Issues
#* TAGM wrongly cabling https://logbooks.jlab.org/entry/3912516 and may have still an issue https://logbooks.jlab.org/entry/3912822 (Beni/Richard)
+
#* TAGM wrongly cabling https://logbooks.jlab.org/entry/3912516 / https://logbooks.jlab.org/entry/3912822 (Beni/Richard)
 
#* No Beam https://logbooks.jlab.org/entry/3912495 https://logbooks.jlab.org/entry/3912567 (Jay, PD)
 
#* No Beam https://logbooks.jlab.org/entry/3912495 https://logbooks.jlab.org/entry/3912567 (Jay, PD)
 
#* TAGH discriminator scalers in EPICS froze https://logbooks.jlab.org/entry/3912490 (Hovanes)
 
#* TAGH discriminator scalers in EPICS froze https://logbooks.jlab.org/entry/3912490 (Hovanes)

Revision as of 10:07, 26 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan
    • Maintenance
      • FCAL (Rebecca/Malte/Mark)
      • Swap one MPGD prototype under test with a new one (Kondo/Lubomir)

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir