Difference between revisions of "Run Planning Meeting Notes, September 23 - September 29, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, September 27)
(Monday, September 27)
Line 10: Line 10:
 
#** FDC1 Cell1 efficiency went up https://logbooks.jlab.org/entry/3913029 (Lubomir)
 
#** FDC1 Cell1 efficiency went up https://logbooks.jlab.org/entry/3913029 (Lubomir)
 
#** New TAGM HV https://logbooks.jlab.org/entry/3913029 (Sasha)
 
#** New TAGM HV https://logbooks.jlab.org/entry/3913029 (Sasha)
 +
#** FCAL pi0 calibration divided into 3 period: Summer 2020 HV, Summer 2020 HV - 6V, and Fall 2021 HV (214 HV adjusted) https://logbooks.jlab.org/entry/3913166 (ig)
 
#* Saturday 8am to Sunday 8am summary:
 
#* Saturday 8am to Sunday 8am summary:
 
#** No beam from 10am to 7pm
 
#** No beam from 10am to 7pm

Revision as of 08:18, 27 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir