Line 7: Line 7:
 
#* Follow-up on possible SC issue https://logbooks.jlab.org/entry/3913352
 
#* Follow-up on possible SC issue https://logbooks.jlab.org/entry/3913352
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
#* Be at low intensity with both chambers turn on (two shifts)
+
#* RadCon will sweep HallD around 1 pm
#*
+
#* Be with 50nA and both chambers turn on (two shifts)
  
 
=Monday, September 27=
 
=Monday, September 27=

Revision as of 08:11, 28 September 2021

<- Back to Run Coordination Meetings:Summer2021

Tuesday, September 28

  1. In last 24 hours:
    • No beam
  1. Issues:
  2. Plan:
    • RadCon will sweep HallD around 1 pm
    • Be with 50nA and both chambers turn on (two shifts)

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir