#* FCAL HV scan https://logbooks.jlab.org/entry/3913887 (Simon) https://logbooks.jlab.org/entry/3913909 (ig)
 
#* FCAL HV scan https://logbooks.jlab.org/entry/3913887 (Simon) https://logbooks.jlab.org/entry/3913909 (ig)
 
#* Beam was back around 7:30 pm
 
#* Beam was back around 7:30 pm
#* Radiation level https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3913887 (Alexandre)
+
#** Radiation level https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3914082 https://logbooks.jlab.org/entry/3913887 (Alexandre)
#* HARP scan https://logbooks.jlab.org/entry/3914082
+
#** HARP scan https://logbooks.jlab.org/entry/3914082
#* Be 200 nA https://logbooks.jlab.org/entry/3914169 (Sasha): 6 x ~200M  
+
#** Be 200 nA https://logbooks.jlab.org/entry/3914169 (Sasha): 6 x ~200M  
 
#* Beam away at 6:30 am until 4:30 pm (maintenance day)
 
#* Beam away at 6:30 am until 4:30 pm (maintenance day)
 
#Issues:
 
#Issues:

Revision as of 06:58, 29 September 2021

<- Back to Run Coordination Meetings:Summer2021

Wednesday, September 29

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Tuesday, September 28

  1. In last 24 hours:
    • No beam
  2. Issues:
  3. Plan:
    • RadCon will sweep HallD around 1 pm
    • Be with 50nA and both chambers turn on (two shifts)

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir