=Thursday, September 23=
+
=Monday, September 27=
# In last 24 hours:  
+
# In last 24 hours:
#* Be target, 10-4 Radiator, ~11M triggers.
+
# Issues
#* Early Riser summary: https://logbooks.jlab.org/entry/3910318 (4am to 10am),
+
#* Owl summary:  https://logbooks.jlab.org/entry/3910862 (10pm to 4am)
+
#* Swing summary:  https://logbooks.jlab.org/entry/3910670 (4pm-10am)
+
#* Day summary: https://logbooks.jlab.org/entry/3910458 (10am to 4pm),
+
#* FCAL pi0 calibration and HV tuning started yesterday at 6 am, https://logbooks.jlab.org/entry/3910786
+
#** With PMT HVs, gains, and pedestals of run 73065
+
#** Then, we subtracted 6V to all PMT HV resulting in a reduction of roughly 5% on all gains
+
#* Sergey made a rapid access to the experimental hall to power cycle NIM crate
+
#* Beni changed the TOF HV a couple of times eg https://logbooks.jlab.org/entry/3910611
+
#* Sergey did a BCAL pedestal runs,
+
#* Sean time calibration https://logbooks.jlab.org/entry/3910464, https://logbooks.jlab.org/entry/3910484
+
#* Sasha adjusted tagh HV
+
# Issues  
+
#* Beni did look at the bleedthrough issue by analyzing timing for different run condition https://logbooks.jlab.org/entry/3910680, https://logbooks.jlab.org/entry/3910800
+
#* After entry to the experimental MCC struggle for almost one hour to send us beam
+
#* Sean time calibration pointed to tagm issues that Richard will address
+
#* FCAL issues, fADC died screwing the FCAL pi0 calibration run see report diphoton invariant mass distribution per ring https://halldweb.jlab.org/primexd/phase2/fcal2021_method0_period_2-g1/
+
#* Full monitoring system (resolved ): back online. Rootspy, twice a day email feed.
+
#* Hall Camera expected to come back online.
+
 
# Plan for the day
 
# Plan for the day
#* tagm studies by Richard
 
#* FDC straight track studies by Lubomir
 
 
 
=Friday, September 24=
 
=Friday, September 24=
 
# In last 24 hours:
 
# In last 24 hours:
Line 50: Line 28:
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan]
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan]
 
#* Compton with Be target at low intensity
 
#* Compton with Be target at low intensity
 +
 +
=Thursday, September 23=
 +
# In last 24 hours:
 +
#* Be target, 10-4 Radiator, ~11M triggers.
 +
#* Early Riser summary: https://logbooks.jlab.org/entry/3910318 (4am to 10am),
 +
#* Owl summary:  https://logbooks.jlab.org/entry/3910862 (10pm to 4am)
 +
#* Swing summary:  https://logbooks.jlab.org/entry/3910670 (4pm-10am)
 +
#* Day summary: https://logbooks.jlab.org/entry/3910458 (10am to 4pm),
 +
#* FCAL pi0 calibration and HV tuning started yesterday at 6 am, https://logbooks.jlab.org/entry/3910786
 +
#** With PMT HVs, gains, and pedestals of run 73065
 +
#** Then, we subtracted 6V to all PMT HV resulting in a reduction of roughly 5% on all gains
 +
#* Sergey made a rapid access to the experimental hall to power cycle NIM crate
 +
#* Beni changed the TOF HV a couple of times eg https://logbooks.jlab.org/entry/3910611
 +
#* Sergey did a BCAL pedestal runs,
 +
#* Sean time calibration https://logbooks.jlab.org/entry/3910464, https://logbooks.jlab.org/entry/3910484
 +
#* Sasha adjusted tagh HV
 +
# Issues
 +
#* Beni did look at the bleedthrough issue by analyzing timing for different run condition https://logbooks.jlab.org/entry/3910680, https://logbooks.jlab.org/entry/3910800
 +
#* After entry to the experimental MCC struggle for almost one hour to send us beam
 +
#* Sean time calibration pointed to tagm issues that Richard will address
 +
#* FCAL issues, fADC died screwing the FCAL pi0 calibration run see report diphoton invariant mass distribution per ring https://halldweb.jlab.org/primexd/phase2/fcal2021_method0_period_2-g1/
 +
#* Full monitoring system (resolved ): back online. Rootspy, twice a day email feed.
 +
#* Hall Camera expected to come back online.
 +
# Plan for the day
 +
#* tagm studies by Richard
 +
#* FDC straight track studies by Lubomir

Revision as of 13:05, 25 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 24 hours:
  2. Issues
  3. Plan for the day

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir