Back to [[Run Coordination Meetings:Fall2022]]
 
Back to [[Run Coordination Meetings:Fall2022]]
  
=Monday, October 3=
+
=Wednesday, October 5=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 +
*[https://logbooks.jlab.org/entry/4051202 No beam since 10:30AM yesterday morning.
 +
*[https://logbooks.jlab.org/entry/4051129 FCAL HV Scan]
 +
*Shift summaries
 +
**[https://logbooks.jlab.org/entry/4051249 0400-1000 05/10]
 +
**[https://logbooks.jlab.org/entry/4051208 2200-0400 04-05/10]
 +
**[https://logbooks.jlab.org/entry/4051155 1600-2200 04/10]
 +
**[https://logbooks.jlab.org/entry/4050971 1000-1600 04/10]
 +
**[https://logbooks.jlab.org/entry/4050764 0400-1000 04/10]
 +
 +
=== Issues ===
 +
*Same 2 CDC channels tripped again twice, had to be slowly ramped back up.
 +
*No beam through day shift due to issue with magnets in SL.
 +
 +
=== Plan ===
 +
*Production data on helium target
 +
 +
=Tuesday, October 4=
 +
=== Past 24 hours ===
 +
*3 FCAL bases replaced (Mark and Malte)
 +
*Issue with separator magnet resolved and beam was restored to Hall D 11:40PM.
 +
**[https://logbooks.jlab.org/entry/4050689 Harp scan results]
 +
*1B triggers collected on He target
 +
**[https://halldweb.jlab.org/primexd/prod_fall_2022/run_list_2022.pdf Primex run list]
 +
*Shift summaries
 +
**[https://logbooks.jlab.org/entry/4050764 0400-1000 04/10]
 +
**[https://logbooks.jlab.org/entry/4050632 2200-0400 03-04/10]
 +
**[https://logbooks.jlab.org/entry/4050531 1600-2200 03/10]
 +
**[https://logbooks.jlab.org/entry/4050327 1000-1600 03/10]
 +
**[https://logbooks.jlab.org/entry/4050260 0400-1000 03/10]
 +
 +
=== Issues ===
 +
*Same 2 CDC channels tripped again today, had to be slowly ramped back up.
 +
*[https://logbooks.jlab.org/entry/4050801 Hot channel in BCAL]
 +
*Shift checklist binder is almost full
 +
 +
=== Plan ===
 +
*Production data on helium target
 +
 +
=Monday, October 3=
 +
=== Over the weekend ===
 +
*Beam was restored to Hall D Saturday morning, 10:45AM.
 +
*[https://logbooks.jlab.org/entry/4049338 Harp scan results]
 +
*After another downtime shortly after harp scans, production running began at 1:20PM Saturday afternoon.
 +
**5.4B triggers collected since Saturday afternoon (He target)
 +
**[https://halldweb.jlab.org/primexd/prod_fall_2022/run_list_2022.pdf Primex run list]
 
*Shift summaries
 
*Shift summaries
**0400-1000 02/10
+
**[https://logbooks.jlab.org/entry/4050260 0400-1000 03/10]
**2200-0400 02-03/10
+
**[https://logbooks.jlab.org/entry/4050113 2200-0400 02-03/10]
**1600-2200 02/10
+
**[https://logbooks.jlab.org/entry/4049986 1600-2200 02/10]
 
**[https://logbooks.jlab.org/entry/4049865 1000-1600 02/10]
 
**[https://logbooks.jlab.org/entry/4049865 1000-1600 02/10]
 
**[https://logbooks.jlab.org/entry/4049774 0400-1000 02/10]
 
**[https://logbooks.jlab.org/entry/4049774 0400-1000 02/10]
  
 
=== Issues ===
 
=== Issues ===
*
+
*RSEP8A magnet overtemp fault issue - SL going to restricted access, probably will need to flush this magnet.
 +
*DAQ Issues (Sergey)
 +
*2 CDC channels tripped and would ramp back up just by resetting normally. Simon ramped them up slowly and since then have been fine.
 +
*[https://logbooks.jlab.org/entry/4049855 BCAL LED pulser script needed to be reset (Mark)]
 +
*[https://logbooks.jlab.org/entry/4049856 3 FCAL bases to be changed]
  
 
=== Plan ===
 
=== Plan ===
Line 32: Line 81:
 
**[https://logbooks.jlab.org/entry/4049301 1000-1600 01/10]
 
**[https://logbooks.jlab.org/entry/4049301 1000-1600 01/10]
 
**[https://logbooks.jlab.org/entry/4049249 0400-1000 01/10]
 
**[https://logbooks.jlab.org/entry/4049249 0400-1000 01/10]
 
=== Issues ===
 
*
 
  
 
=== Plan ===
 
=== Plan ===
 
*Production data on helium target
 
*Production data on helium target
 +
 
=Saturday, October 1=
 
=Saturday, October 1=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
Line 46: Line 93:
 
**[https://logbooks.jlab.org/entry/4048929 1000-1600 30/09]
 
**[https://logbooks.jlab.org/entry/4048929 1000-1600 30/09]
 
**[https://logbooks.jlab.org/entry/4048874 0400-1000 30/09]
 
**[https://logbooks.jlab.org/entry/4048874 0400-1000 30/09]
 
=== Issues ===
 
*
 
  
 
=== Plan ===
 
=== Plan ===

Latest revision as of 09:00, 5 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Wednesday, October 5

Past 24 hours

Issues

  • Same 2 CDC channels tripped again twice, had to be slowly ramped back up.
  • No beam through day shift due to issue with magnets in SL.

Plan

  • Production data on helium target

Tuesday, October 4

Past 24 hours

Issues

  • Same 2 CDC channels tripped again today, had to be slowly ramped back up.
  • Hot channel in BCAL
  • Shift checklist binder is almost full

Plan

  • Production data on helium target

Monday, October 3

Over the weekend

Issues

Plan

  • Production data on helium target

Sunday, October 2

Past 24 hours

Plan

  • Production data on helium target

Saturday, October 1

Past 24 hours

Plan

  • Production data on helium target

Friday, September 30

Past 24 hours

Issues

Plan

  • Once beam is back, re-do harp scans.
  • Continue taking production data on LHe at 200nA today and over the weekend.
  • PS Triggers collected since He target cell inserted:
    • With target filled: 5.58B
    • With target empty: 1.63B
    • Empty/Full = 0.29, Percentage of flux spent on empty: 22.6%

Thursday, September 29

Past 24 hours

Issues

Plan

  • Maintenance Day
    • Hall in controlled access.
    • Walkthrough training at 10AM.
  • When beam is back, we will continue taking production data on LHe at 200nA.