Difference between revisions of "Run Planning Meeting Notes, September 29 - October 5, 2022"

From GlueXWiki
Jump to: navigation, search
m (Plan)
m (Friday, September 30)
Line 13: Line 13:
 
*Long maintenance day dedicated to RF recovery and injector setup in preparation for Hall A coming online
 
*Long maintenance day dedicated to RF recovery and injector setup in preparation for Hall A coming online
 
**[https://logbooks.jlab.org/entry/4048486 Tagger NMR Probe Meter (Scot)]
 
**[https://logbooks.jlab.org/entry/4048486 Tagger NMR Probe Meter (Scot)]
 +
**[https://logbooks.jlab.org/entry/4048910 Calorimeter modules replace in PS (Sasha)]
 
**We collected 43.6M raw-mode cosmics events since yesterday morning.
 
**We collected 43.6M raw-mode cosmics events since yesterday morning.
 
*Beam was restored to Hall D at 11PM last night. We completed the accelerator harp scans on 5C11/B and our radiator wire scan.
 
*Beam was restored to Hall D at 11PM last night. We completed the accelerator harp scans on 5C11/B and our radiator wire scan.

Revision as of 08:43, 30 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, September 30

Past 24 hours

Issues

Plan

  • Once beam is back, re-do harp scans.
  • Continue taking production data on LHe at 200nA today and over the weekend.
  • PS Triggers collected since He target cell inserted:
    • With target filled: 5.58B
    • With target empty: 1.63B
    • Empty/Full = 0.29, Percentage of flux spent on empty: 22.6%

Thursday, September 29

Past 24 hours

Issues

Plan

  • Maintenance Day
    • Hall in controlled access.
    • Walkthrough training at 10AM.
  • When beam is back, we will continue taking production data on LHe at 200nA.