=Monday, October 3=
 
=Monday, October 3=
=== Past 24 hours ===
+
=== Over the weekend ===
 +
*Beam was restored to Hall D Saturday morning, 10:45AM.
 +
*[https://logbooks.jlab.org/entry/4049338 Harp scan results]
 +
*After another downtime shortly after harp scans, production running began at 1:20PM Saturday afternoon.
 +
**trigger counts
 
*Shift summaries
 
*Shift summaries
 
**0400-1000 02/10
 
**0400-1000 02/10
**2200-0400 02-03/10
+
**[https://logbooks.jlab.org/entry/4050113 2200-0400 02-03/10]
**1600-2200 02/10
+
**[https://logbooks.jlab.org/entry/4049986 1600-2200 02/10]
 
**[https://logbooks.jlab.org/entry/4049865 1000-1600 02/10]
 
**[https://logbooks.jlab.org/entry/4049865 1000-1600 02/10]
 
**[https://logbooks.jlab.org/entry/4049774 0400-1000 02/10]
 
**[https://logbooks.jlab.org/entry/4049774 0400-1000 02/10]
  
 
=== Issues ===
 
=== Issues ===
*
+
*DAQ Issues (Sergey)
 +
*2 CDC channels tripped and would ramp back up just by resetting normally. Simon ramped them up slowly and since then have been fine.
 +
*[https://logbooks.jlab.org/entry/4049855 BCAL LED pulser script needed to be reset (Mark)]
 +
*[https://logbooks.jlab.org/entry/4049856 3 FCAL bases to be changed]
  
 
=== Plan ===
 
=== Plan ===

Revision as of 23:32, 2 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, October 3

Over the weekend

Issues

Plan

  • Production data on helium target

Sunday, October 2

Past 24 hours

Issues

Plan

  • Production data on helium target

Saturday, October 1

Past 24 hours

Issues

Plan

  • Production data on helium target

Friday, September 30

Past 24 hours

Issues

Plan

  • Once beam is back, re-do harp scans.
  • Continue taking production data on LHe at 200nA today and over the weekend.
  • PS Triggers collected since He target cell inserted:
    • With target filled: 5.58B
    • With target empty: 1.63B
    • Empty/Full = 0.29, Percentage of flux spent on empty: 22.6%

Thursday, September 29

Past 24 hours

Issues

Plan

  • Maintenance Day
    • Hall in controlled access.
    • Walkthrough training at 10AM.
  • When beam is back, we will continue taking production data on LHe at 200nA.