*RSEP8A magnet overtemp fault issue - SL going to restricted access, probably will need to flush this magnet.
 
*DAQ Issues (Sergey)
 
*DAQ Issues (Sergey)
 
*2 CDC channels tripped and would ramp back up just by resetting normally. Simon ramped them up slowly and since then have been fine.
 
*2 CDC channels tripped and would ramp back up just by resetting normally. Simon ramped them up slowly and since then have been fine.

Revision as of 08:40, 3 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, October 3

Over the weekend

Issues

Plan

  • Production data on helium target

Sunday, October 2

Past 24 hours

Plan

  • Production data on helium target

Saturday, October 1

Past 24 hours

Plan

  • Production data on helium target

Friday, September 30

Past 24 hours

Issues

Plan

  • Once beam is back, re-do harp scans.
  • Continue taking production data on LHe at 200nA today and over the weekend.
  • PS Triggers collected since He target cell inserted:
    • With target filled: 5.58B
    • With target empty: 1.63B
    • Empty/Full = 0.29, Percentage of flux spent on empty: 22.6%

Thursday, September 29

Past 24 hours

Issues

Plan

  • Maintenance Day
    • Hall in controlled access.
    • Walkthrough training at 10AM.
  • When beam is back, we will continue taking production data on LHe at 200nA.