=Tuesday, October 4=
 +
=== Past 24 hours ===
 +
*3 FCAL bases replaced (Mark and Malte)
 +
*Issue with separator magnet resolved and beam was restored to Hall D 11:40PM.
 +
**[https://logbooks.jlab.org/entry/4050689 Harp scan results]
 +
*1B triggers collected on He target
 +
**[https://halldweb.jlab.org/primexd/prod_fall_2022/run_list_2022.pdf Primex run list]
 +
*Shift summaries
 +
**[https://logbooks.jlab.org/entry/4050764 0400-1000 04/10]
 +
**[https://logbooks.jlab.org/entry/4050632 2200-0400 03-04/10]
 +
**[https://logbooks.jlab.org/entry/4050531 1600-2200 03/10]
 +
**[https://logbooks.jlab.org/entry/4050327 1000-1600 03/10]
 +
**[https://logbooks.jlab.org/entry/4050260 0400-1000 03/10]
 +
 +
=== Issues ===
 +
*Same 2 CDC channels tripped again today, had to be slowly ramped back up.
 +
*[https://logbooks.jlab.org/entry/4050801 Hot channel in BCAL]
 +
*Shift checklist binder is almost full
 +
 +
=== Plan ===
 +
*Production data on helium target
  
 
=Monday, October 3=
 
=Monday, October 3=

Revision as of 08:04, 4 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday, October 4

Past 24 hours

Issues

  • Same 2 CDC channels tripped again today, had to be slowly ramped back up.
  • Hot channel in BCAL
  • Shift checklist binder is almost full

Plan

  • Production data on helium target

Monday, October 3

Over the weekend

Issues

Plan

  • Production data on helium target

Sunday, October 2

Past 24 hours

Plan

  • Production data on helium target

Saturday, October 1

Past 24 hours

Plan

  • Production data on helium target

Friday, September 30

Past 24 hours

Issues

Plan

  • Once beam is back, re-do harp scans.
  • Continue taking production data on LHe at 200nA today and over the weekend.
  • PS Triggers collected since He target cell inserted:
    • With target filled: 5.58B
    • With target empty: 1.63B
    • Empty/Full = 0.29, Percentage of flux spent on empty: 22.6%

Thursday, September 29

Past 24 hours

Issues

Plan

  • Maintenance Day
    • Hall in controlled access.
    • Walkthrough training at 10AM.
  • When beam is back, we will continue taking production data on LHe at 200nA.