=Wednesday, October 5=
 +
=== Past 24 hours ===
 +
*[https://logbooks.jlab.org/entry/4051202 No beam since 10:30AM yesterday morning.
 +
*[https://logbooks.jlab.org/entry/4051129 FCAL HV Scan]
 +
*Shift summaries
 +
**[https://logbooks.jlab.org/entry/4051249 0400-1000 05/10]
 +
**[https://logbooks.jlab.org/entry/4051208 2200-0400 04-05/10]
 +
**[https://logbooks.jlab.org/entry/4051155 1600-2200 04/10]
 +
**[https://logbooks.jlab.org/entry/4050971 1000-1600 04/10]
 +
**[https://logbooks.jlab.org/entry/4050764 0400-1000 04/10]
 +
 +
=== Issues ===
 +
*Same 2 CDC channels tripped again twice, had to be slowly ramped back up.
 +
*No beam through day shift due to issue with magnets in SL.
 +
 +
=== Plan ===
 +
*Production data on helium target
  
 
=Tuesday, October 4=
 
=Tuesday, October 4=

Latest revision as of 09:00, 5 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Wednesday, October 5

Past 24 hours

Issues

  • Same 2 CDC channels tripped again twice, had to be slowly ramped back up.
  • No beam through day shift due to issue with magnets in SL.

Plan

  • Production data on helium target

Tuesday, October 4

Past 24 hours

Issues

  • Same 2 CDC channels tripped again today, had to be slowly ramped back up.
  • Hot channel in BCAL
  • Shift checklist binder is almost full

Plan

  • Production data on helium target

Monday, October 3

Over the weekend

Issues

Plan

  • Production data on helium target

Sunday, October 2

Past 24 hours

Plan

  • Production data on helium target

Saturday, October 1

Past 24 hours

Plan

  • Production data on helium target

Friday, September 30

Past 24 hours

Issues

Plan

  • Once beam is back, re-do harp scans.
  • Continue taking production data on LHe at 200nA today and over the weekend.
  • PS Triggers collected since He target cell inserted:
    • With target filled: 5.58B
    • With target empty: 1.63B
    • Empty/Full = 0.29, Percentage of flux spent on empty: 22.6%

Thursday, September 29

Past 24 hours

Issues

Plan

  • Maintenance Day
    • Hall in controlled access.
    • Walkthrough training at 10AM.
  • When beam is back, we will continue taking production data on LHe at 200nA.