(Thursday, September 30)
(Thursday, September 30)
Line 3: Line 3:
 
=Thursday, September 30=
 
=Thursday, September 30=
 
#In last 24 hours:
 
#In last 24 hours:
#* Machine maintenance ended around 21:20, but we don't have a beam as of 7:30 (injector non-colinearity, 5E03 BLM trips, ...).
+
#* Machine maintenance ended around 21:20, but we don't have a beam as of 8:00 (injector non-colinearity, 5E03 BLM trips, ...).
 
#* [https://logbooks.jlab.org/entry/3915104 Early Riser summary]
 
#* [https://logbooks.jlab.org/entry/3915104 Early Riser summary]
 
#* [https://logbooks.jlab.org/entry/3914937 Owl summary]
 
#* [https://logbooks.jlab.org/entry/3914937 Owl summary]

Revision as of 07:57, 30 September 2021

<- Back to Run Coordination Meetings:Summer2021

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target