Difference between revisions of "Run Planning Meeting Notes, September 30 - October 6, 2021"
From GlueXWiki
(→Thursday, September 30) |
(→Thursday, September 30) |
||
Line 1: | Line 1: | ||
<- Back to [[Run Coordination Meetings:Summer2021]] | <- Back to [[Run Coordination Meetings:Summer2021]] | ||
+ | |||
+ | =Friday, October 1= | ||
+ | #In last 24 hours: | ||
+ | #* Beam came back around XXX. | ||
+ | #* Early Riser summary | ||
+ | #* Owl summary | ||
+ | #* Swing summary | ||
+ | #* [https://logbooks.jlab.org/entry/3915186 Day summary] | ||
+ | #Issues: | ||
+ | #* Bleedthrough | ||
+ | #[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
+ | #* Before taking data: [https://logbooks.jlab.org/entry/3913494 check radiation level and beam quality] (HARP scan) | ||
+ | #* 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around | ||
+ | #* 100 nA CDC & FDC turn off (2 shifts) | ||
+ | #* 200 nA CDC & FDC turn off (8.4 shifts) | ||
+ | #* Remove Be target to take empty target (will take 8h. on Monday?) | ||
+ | |||
=Thursday, September 30= | =Thursday, September 30= |
Revision as of 11:01, 30 September 2021
<- Back to Run Coordination Meetings:Summer2021
Friday, October 1
- In last 24 hours:
- Beam came back around XXX.
- Early Riser summary
- Owl summary
- Swing summary
- Day summary
- Issues:
- Bleedthrough
- Plan:
- Before taking data: check radiation level and beam quality (HARP scan)
- 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
- 100 nA CDC & FDC turn off (2 shifts)
- 200 nA CDC & FDC turn off (8.4 shifts)
- Remove Be target to take empty target (will take 8h. on Monday?)
Thursday, September 30
- In last 24 hours:
- Machine maintenance ended around 21:20, but we don't have a beam as of 8:30 (injector non-colinearity, 5E03 BLM trips, ...).
- Early Riser summary
- Owl summary
- Swing summary
- Day summary
- During downtime for maintenance:
- BCAL pedestal calibration (Sergey)
- FCAL base replacementCommunication issue resolved(Rebecca/Mark/Malte)
- FCAL HV scan (Igal)
- Timing calibration update (Sean)
- Beni started Special Run 81291 for SC dark rate at 8:30 remotely. (will take ~0.5h)
- Issues:
- Strange behavior in FCAL base (Rebecca/Mark/Malte)
- 5 FCAL bases don't reach 1800V (Mark/Malte)
- Bleedthrough
- Plan:
- Before taking data: check radiation level and beam quality (HARP scan)
- 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
- 100 nA CDC & FDC turn off (2 shifts)
- 200 nA CDC & FDC turn off (8.4 shifts)
- Remove Be target to take empty target (will take 8h. on Monday?)