(Thursday, September 30)
(Thursday, September 30)
Line 1: Line 1:
 
<- Back to [[Run Coordination Meetings:Summer2021]]
 
<- Back to [[Run Coordination Meetings:Summer2021]]
 +
 +
=Friday, October 1=
 +
#In last 24 hours:
 +
#* Beam came back around XXX.
 +
#* Early Riser summary
 +
#* Owl summary
 +
#* Swing summary
 +
#* [https://logbooks.jlab.org/entry/3915186 Day summary]
 +
#Issues:
 +
#* Bleedthrough
 +
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
#* Before taking data: [https://logbooks.jlab.org/entry/3913494 check radiation level and beam quality] (HARP scan)
 +
#* 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
 +
#* 100 nA CDC & FDC turn off (2 shifts)
 +
#* 200 nA CDC & FDC turn off (8.4 shifts)
 +
#* Remove Be target to take empty target (will take 8h. on Monday?)
 +
  
 
=Thursday, September 30=
 
=Thursday, September 30=

Revision as of 11:01, 30 September 2021

<- Back to Run Coordination Meetings:Summer2021

Friday, October 1

  1. In last 24 hours:
    • Beam came back around XXX.
    • Early Riser summary
    • Owl summary
    • Swing summary
    • Day summary
  2. Issues:
    • Bleedthrough
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)


Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)