(Thursday, September 30)
(Friday, October 1)
Line 6: Line 6:
 
#* Early Riser summary
 
#* Early Riser summary
 
#* Owl summary
 
#* Owl summary
#* Swing summary
+
#* [https://logbooks.jlab.org/entry/3915397 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3915186 Day summary]
 
#* [https://logbooks.jlab.org/entry/3915186 Day summary]
 
#Issues:
 
#Issues:
Line 16: Line 16:
 
#* 200 nA CDC & FDC turn off (8.4 shifts)
 
#* 200 nA CDC & FDC turn off (8.4 shifts)
 
#* Remove Be target to take empty target (will take 8h. on Monday?)
 
#* Remove Be target to take empty target (will take 8h. on Monday?)
 
  
 
=Thursday, September 30=
 
=Thursday, September 30=

Revision as of 17:14, 30 September 2021

<- Back to Run Coordination Meetings:Summer2021

Friday, October 1

  1. In last 24 hours:
  2. Issues:
    • Bleedthrough
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)