(Friday, October 1)
(Friday, October 1)
Line 4: Line 4:
 
#In last 24 hours:
 
#In last 24 hours:
 
#* Beam came back around 17:40.
 
#* Beam came back around 17:40.
#** Radiation Level OK: https://logbooks.jlab.org/entry/3915397
+
#** [https://logbooks.jlab.org/entry/3915397 Radiation Level is OK]
 
#** Harp scan OK? checking ..
 
#** Harp scan OK? checking ..
 
#* Early Riser summary
 
#* Early Riser summary

Revision as of 18:22, 30 September 2021

<- Back to Run Coordination Meetings:Summer2021

Friday, October 1

  1. In last 24 hours:
  2. Issues:
    • Bleedthrough
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)