Difference between revisions of "Run Planning Meeting Notes, September 30 - October 6, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 1)
(Friday, October 1)
Line 7: Line 7:
 
#** Harp scan: OK? checking ..
 
#** Harp scan: OK? checking ..
 
#* Early Riser summary
 
#* Early Riser summary
#* Owl summary
+
#* [https://logbooks.jlab.org/entry/3915599 Owl summary]
 
#* [https://logbooks.jlab.org/entry/3915397 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3915397 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3915186 Day summary]
 
#* [https://logbooks.jlab.org/entry/3915186 Day summary]

Revision as of 22:50, 30 September 2021

<- Back to Run Coordination Meetings:Summer2021

Friday, October 1

  1. In last 24 hours:
  2. Issues:
    • Bleedthrough
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)