Difference between revisions of "Run Planning Meeting Notes, September 30 - October 6, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 1)
(Friday, October 1)
Line 5: Line 5:
 
#* Beam came back around 17:40.
 
#* Beam came back around 17:40.
 
#** [https://logbooks.jlab.org/entry/3915397 Radiation Level]: OK
 
#** [https://logbooks.jlab.org/entry/3915397 Radiation Level]: OK
#** Harp scan: OK? checking ..
+
#** [https://logbooks.jlab.org/entry/3915472 Harp scan]: OK
#* Early Riser summary
+
#* [https://logbooks.jlab.org/entry/3915714 Early Riser summary]
 
#* [https://logbooks.jlab.org/entry/3915599 Owl summary]
 
#* [https://logbooks.jlab.org/entry/3915599 Owl summary]
 
#* [https://logbooks.jlab.org/entry/3915397 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3915397 Swing summary]

Revision as of 08:06, 1 October 2021

<- Back to Run Coordination Meetings:Summer2021

Friday, October 1

  1. In last 24 hours:
  2. Issues:
    • Bleedthrough
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)