=Saturday, October 2, 10:00 am=
 
=Saturday, October 2, 10:00 am=
Line 26: Line 26:
 
#** Bleedthrough .. more likely get worse when Hall A comes on line on Wed.
 
#** Bleedthrough .. more likely get worse when Hall A comes on line on Wed.
 
#** [https://logbooks.jlab.org/entry/3916403 Bleedthough today]
 
#** [https://logbooks.jlab.org/entry/3916403 Bleedthough today]
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
+
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan]:
 
#* After this 10:00 meeting, we will stop 50 nA production and turn off chambers (Lubomir is on shift), then Sasha will perform rate scan (it will take 40 min). After that, we will move on to 100 nA production.
 
#* After this 10:00 meeting, we will stop 50 nA production and turn off chambers (Lubomir is on shift), then Sasha will perform rate scan (it will take 40 min). After that, we will move on to 100 nA production.
 
#* 100 nA CDC & FDC turn off (2 shifts)
 
#* 100 nA CDC & FDC turn off (2 shifts)
Line 49: Line 49:
 
#* [https://logbooks.jlab.org/entry/3915713 FCAL FADC scalers disconnected]
 
#* [https://logbooks.jlab.org/entry/3915713 FCAL FADC scalers disconnected]
 
#* Bleedthrough
 
#* Bleedthrough
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
+
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan]:
 
#* 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
 
#* 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
 
#* 100 nA CDC & FDC turn off (2 shifts)
 
#* 100 nA CDC & FDC turn off (2 shifts)
Line 73: Line 73:
 
#* [https://logbooks.jlab.org/entry/3914823 5 FCAL bases don't reach 1800V] (Mark/Malte)
 
#* [https://logbooks.jlab.org/entry/3914823 5 FCAL bases don't reach 1800V] (Mark/Malte)
 
#* Bleedthrough
 
#* Bleedthrough
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
+
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan]:
 
#* Before taking data: [https://logbooks.jlab.org/entry/3913494 check radiation level and beam quality] ([https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan HARP scan])
 
#* Before taking data: [https://logbooks.jlab.org/entry/3913494 check radiation level and beam quality] ([https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan HARP scan])
 
#* 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
 
#* 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around

Revision as of 11:35, 2 October 2021

<- Back to Run Coordination Meetings:Summer2021

Sunday, October 3, 10:00 am

  1. In last 24 hours:
    • Early Riser summary
    • Owl summary
    • Swing summary
    • Day summary
  2. Issues:
  3. Plan:

Saturday, October 2, 10:00 am

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • After this 10:00 meeting, we will stop 50 nA production and turn off chambers (Lubomir is on shift), then Sasha will perform rate scan (it will take 40 min). After that, we will move on to 100 nA production.
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h)
      • On Tuesday, there will very likely be a down time (beam studies or another attempt to fix the Hall C tune mode generator).
      • Hall A will come on line on Wed. (tentative schedule)
    • For shift workers: FCAL scaler should be checked frequently.

Friday, October 1

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)