(Saturday, October 2, 10:00 am)
(Sunday, October 3, 10:00 am)
Line 4: Line 4:
 
#In last 24 hours:
 
#In last 24 hours:
 
#* Early Riser summary
 
#* Early Riser summary
#* Owl summary
+
#* [https://logbooks.jlab.org/entry/3916760 Owl summary]
 
#* [https://logbooks.jlab.org/entry/3916522 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3916522 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3916421 Day summary]
 
#* [https://logbooks.jlab.org/entry/3916421 Day summary]

Revision as of 22:07, 2 October 2021

<- Back to Run Coordination Meetings:Summer2021

Sunday, October 3, 10:00 am

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Saturday, October 2, 10:00 am

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • After this 10:00 meeting, we will stop 50 nA production and turn off chambers (Lubomir is on shift), then Sasha will perform rate scan (it will take 40 min). After that, we will move on to 100 nA production.
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h)
      • On Tuesday, there will very likely be a down time (beam studies or another attempt to fix the Hall C tune mode generator).
      • Hall A will come on line on Wed. (tentative schedule)
    • For shift workers: FCAL scaler should be checked frequently.

Friday, October 1

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)