Difference between revisions of "Run Planning Meeting Notes, September 30 - October 6, 2021"

From GlueXWiki
Jump to: navigation, search
(Tuesday, October 5)
Line 12: Line 12:
 
#* [https://logbooks.jlab.org/entry/3917520 Weird time difference distribution between two FCAL clusters] (Igal)
 
#* [https://logbooks.jlab.org/entry/3917520 Weird time difference distribution between two FCAL clusters] (Igal)
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan]:
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan]:
 +
#* After target work:
 +
#** [https://logbooks.jlab.org/entry/3913494 Radiation level check] and [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan Harp scan]
 
#* Take data with empty target (He-4 gas target).
 
#* Take data with empty target (He-4 gas target).
 
#* Hall A will come on line tomorrow afternoon/evening.
 
#* Hall A will come on line tomorrow afternoon/evening.

Revision as of 08:16, 5 October 2021

<- Back to Run Coordination Meetings:Summer2021

Tuesday, October 5

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Monday, October 4

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Sunday, October 3, 10:00 am

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Saturday, October 2, 10:00 am

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • After this 10:00 meeting, we will stop 50 nA production and turn off chambers (Lubomir is on shift), then Sasha will perform rate scan (it will take 40 min). After that, we will move on to 100 nA production.
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h)
      • On Tuesday, there will very likely be a down time (beam studies or another attempt to fix the Hall C tune mode generator).
      • Hall A will come on line on Wed. (tentative schedule)
    • For shift workers: FCAL scaler should be checked frequently.

Friday, October 1

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)