Difference between revisions of "Run Planning Meeting Notes, September 30 - October 6, 2021"

From GlueXWiki
Jump to: navigation, search
(Tuesday, October 5)
(Tuesday, October 5)
Line 9: Line 9:
 
#* [https://logbooks.jlab.org/entry/3917744 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3917744 Swing summary]
 
#* [https://logbooks.jlab.org/entry/3917557 Day summary]
 
#* [https://logbooks.jlab.org/entry/3917557 Day summary]
#* We didn't take data for bleedthrough study (with laser off) yesterday. yes we did run 81383 see: [https://logbooks.jlab.org/entry/3917724 beam structure]
+
#* We didn't take data for bleedthrough study (with laser off) yesterday. yes we did run 81383 (but short) see: [https://logbooks.jlab.org/entry/3917724 beam structure]
 
#Issues:
 
#Issues:
 
#* [https://logbooks.jlab.org/entry/3917520 Weird time difference distribution between two FCAL clusters] (Igal)
 
#* [https://logbooks.jlab.org/entry/3917520 Weird time difference distribution between two FCAL clusters] (Igal)

Revision as of 08:28, 5 October 2021

<- Back to Run Coordination Meetings:Summer2021

Tuesday, October 5

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • After target work:
    • Take data with empty target (He-4 gas target).
      • 4 shifts with a 200 nA beam. Do we need to take data with 100nA/50nA beams?
      • After this empty target run, we will fill the target (0.5 shift) and start production runs.
    • Hall A will come on line tomorrow afternoon/evening.
    • For shift workers: FCAL scaler should be checked frequently.

Monday, October 4

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Sunday, October 3, 10:00 am

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Saturday, October 2, 10:00 am

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • After this 10:00 meeting, we will stop 50 nA production and turn off chambers (Lubomir is on shift), then Sasha will perform rate scan (it will take 40 min). After that, we will move on to 100 nA production.
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h)
      • On Tuesday, there will very likely be a down time (beam studies or another attempt to fix the Hall C tune mode generator).
      • Hall A will come on line on Wed. (tentative schedule)
    • For shift workers: FCAL scaler should be checked frequently.

Friday, October 1

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Thursday, September 30

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Before taking data: check radiation level and beam quality (HARP scan)
    • 50 nA with CDC & FDC turn on (2 shifts), Lubomir must be around
    • 100 nA CDC & FDC turn off (2 shifts)
    • 200 nA CDC & FDC turn off (8.4 shifts)
    • Remove Be target to take empty target (will take 8h. on Monday?)