Run Planning Meeting Notes, September 9 - September 15, 2021

From GlueXWiki
Revision as of 08:40, 14 September 2021 by Dalton (Talk | contribs) (Tuesday, September 14)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Summer2021

Tuesday, September 14

  1. Last 24 hours:
  2. Report/issue
    1. rocfcal11 cannot be remotely rebooted
    2. Sometimes whole crates are missing from CSS view.
    3. Sometimes single 16 ch fADCs report 0.
    4. Sometimes CSS on gluon02 doesn't show the same thing as CSS on gluon03.
  3. Run plan
    • Wait for beam delivery. Begin experiment commissioning. Run plan