Difference between revisions of "Run Wiki"
From GlueXWiki
Line 22: | Line 22: | ||
====[https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], [https://www.jlab.org/Hall-D/safety-docs/current/ESAD.pdf ESAD], [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift. ==== | ====[https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], [https://www.jlab.org/Hall-D/safety-docs/current/ESAD.pdf ESAD], [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift. ==== | ||
====[[Analysis shift]] ==== | ====[[Analysis shift]] ==== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Run Plan November XXXX, 2021 == | == Run Plan November XXXX, 2021 == |
Revision as of 12:28, 28 September 2021
SRC/CT@GlueX (E12-19-003) 2021 run, November-January
- Run Coordination Meetings (Daily 8:45 am)
- BlueJeans in the Counting Room:348194990
- Training and Safety Documentation
- SRC/CT@GlueX Full Run Plan
General Shift Information
Hall D Shift-Taker's Main Site
On-call List
- Contact run coordinator if any problems during data taking: (757) 383-5542
Shift Schedule
Shift Sign-up
Shift-Taker's Checklist
Beam Time Accounting
Run Spreadsheet 2021
COO, ESAD, RSAD Things to read before shift.
Analysis shift
Run Plan November XXXX, 2021
- Take production data: XXXX nA beam on the XXXX target, XXXX configuration, XXXX trigger XXXXX.trg. Each run should last about XXX hours.
Every Shift:
- Follow the run plan as outlined by RC
- With any issue contact On-Call Experts or RC
- Keep shift summary up to date in HDLOG. Record all that happens.
- Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment E12-19-003. . At the end of the shift send BTA to the logbook.
- Fill and submit the shift checklist in the logbook
Every Run:
- After "Go":
- Update the Run Spreadsheet
- Check ROOTSpy and compare plots with ....
Remote Shifts
Overview
- Bluejeans for 24-7 communication with counting house: https://bluejeans.com/XXXXX
- Remote VNC connection instructions: Guidelines for Remote Worker Shift
Tasks
- Fill shift checklist
- Upload plots to the Hall D logbook once per run
- ?????
- Monitor beam quality
- EPICS overview screen
- In VNC or [XXXXXX Web Browser]
- Strip charts
- EPICS overview screen
- Monitor data quality
- Communicate with the shift expert about issues with any of the above