Difference between revisions of "Run Wiki"

From GlueXWiki
Jump to: navigation, search
Line 22: Line 22:
 
====[https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], [https://www.jlab.org/Hall-D/safety-docs/current/ESAD.pdf ESAD], [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift. ====
 
====[https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], [https://www.jlab.org/Hall-D/safety-docs/current/ESAD.pdf ESAD], [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift. ====
 
====[[Analysis shift]] ====
 
====[[Analysis shift]] ====
 
== <font color=red> Important instructions </font> ==
 
 
=== * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. ===
 
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
 
=== * Please close any GUI that is not being used. ===
 
 
  
 
== Run Plan November XXXX, 2021 ==
 
== Run Plan November XXXX, 2021 ==

Revision as of 12:28, 28 September 2021

SRC/CT@GlueX (E12-19-003) 2021 run, November-January



General Shift Information

Hall D Shift-Taker's Main Site

On-call List

  • Contact run coordinator if any problems during data taking: (757) 383-5542

Shift Schedule

Shift Sign-up

Shift-Taker's Checklist

Beam Time Accounting

Run Spreadsheet 2021

COO, ESAD, RSAD Things to read before shift.

Analysis shift

Run Plan November XXXX, 2021

  • Take production data: XXXX nA beam on the XXXX target, XXXX configuration, XXXX trigger XXXXX.trg. Each run should last about XXX hours.


Every Shift:

  1. Follow the run plan as outlined by RC
  2. With any issue contact On-Call Experts or RC
  3. Keep shift summary up to date in HDLOG. Record all that happens.
    • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment E12-19-003. . At the end of the shift send BTA to the logbook.
    • Fill and submit the shift checklist in the logbook

Every Run:

  1. After "Go":
  2. Update the Run Spreadsheet
  3. Check ROOTSpy and compare plots with ....


Remote Shifts

Overview

Tasks

  • Fill shift checklist
  • Upload plots to the Hall D logbook once per run
    •  ?????
  • Monitor beam quality
    • EPICS overview screen
      • In VNC or [XXXXXX Web Browser]
    • Strip charts
  • Monitor data quality
  • Communicate with the shift expert about issues with any of the above