Difference between revisions of "Run Wiki"

From GlueXWiki
Jump to: navigation, search
Line 11: Line 11:
 
= General Shift Information =
 
= General Shift Information =
  
====[https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Hall D Shift-Taker's Main Site]====
+
* [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page Hall D Shift-Taker's Main Site]
====[https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page  On-call List]====
+
* [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page  On-call List]
* Contact run coordinator if any problems during data taking: (757) 383-5542
+
** Contact run coordinator if any problems during data taking: (757) 383-5542
====[https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLD-SRCCT Shift Schedule]====
+
* [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLD-SRCCT Shift Schedule]
====[https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLD-SRCCT Shift Sign-up]====
+
* [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLD-SRCCT Shift Sign-up]
====[https://halldweb.jlab.org/hdops/wiki/index.php/Shift_Checklist Shift-Taker's Checklist] ====
+
* [https://halldweb.jlab.org/hdops/wiki/index.php/Shift_Checklist Shift-Taker's Checklist]  
====[https://bta Beam Time Accounting]====
+
* [https://bta Beam Time Accounting]
====[https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Run Spreadsheet 2021]====
+
* [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Run Spreadsheet 2021]
 
+
* [https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], [https://www.jlab.org/Hall-D/safety-docs/current/ESAD.pdf ESAD], [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift.
====[https://www.jlab.org/Hall-D/safety-docs/current/COO.pdf COO], [https://www.jlab.org/Hall-D/safety-docs/current/ESAD.pdf ESAD], [[Media: Final_RCD-RSAD-09.01.2021-HD_SRC-CT_KW_PD_LZ_LP_ja_encrypted_(1).pdf | RSAD]] Things to read before shift. ====
+
* [[Analysis shift info]]
====[[Analysis shift]] ====
+
  
 
= Run Plan November XXXX, 2021 =
 
= Run Plan November XXXX, 2021 =

Revision as of 12:32, 28 September 2021

SRC/CT@GlueX (E12-19-003) 2021 run, November-January


General Shift Information

Run Plan November XXXX, 2021

  • Take production data: XXXX nA beam on the XXXX target, XXXX configuration, XXXX trigger XXXXX.trg. Each run should last about XXX hours.


Every Shift:

  1. Follow the run plan as outlined by RC
  2. With any issue contact On-Call Experts or RC
  3. Keep shift summary up to date in HDLOG. Record all that happens.
    • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment E12-19-003. . At the end of the shift send BTA to the logbook.
    • Fill and submit the shift checklist in the logbook

Every Run:

  1. After "Go":
  2. Update the Run Spreadsheet
  3. Check ROOTSpy and compare plots with ....


Remote Shifts

Overview

Tasks

  • Fill shift checklist
  • Upload plots to the Hall D logbook once per run
    •  ?????
  • Monitor beam quality
    • EPICS overview screen
      • In VNC or [XXXXXX Web Browser]
    • Strip charts
  • Monitor data quality
  • Communicate with the shift expert about issues with any of the above