Difference between revisions of "Run Wiki"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
  
  
= Shift Documentation =
+
= General Shift Information =
  
 
{| {{TableStyle1}}
 
{| {{TableStyle1}}
Line 57: Line 57:
 
[https://bluejeans.com/XXXX Bluejeans for Run Meetings on DAY and DAY at 8:45 am]
 
[https://bluejeans.com/XXXX Bluejeans for Run Meetings on DAY and DAY at 8:45 am]
 
</font></center>
 
</font></center>
 
== RC: XXXXXX  ==
 
* (757) 383-5542 
 
* Personal cell: +1 XXXXXXX
 
  
 
== <font color=red> Important instructions </font> ==
 
== <font color=red> Important instructions </font> ==
 
  
 
=== * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. ===
 
=== * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. ===
Line 74: Line 69:
 
* '''Take production data''':  XXXX nA beam on the XXXX target, XXXX configuration, XXXX trigger '''XXXXX.trg'''. Each run should last about XXX hours.
 
* '''Take production data''':  XXXX nA beam on the XXXX target, XXXX configuration, XXXX trigger '''XXXXX.trg'''. Each run should last about XXX hours.
  
 
===Hall Access Items:===
 
* None
 
  
 
==Every Shift:==
 
==Every Shift:==
Line 89: Line 81:
 
# Update the [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Run Spreadsheet]
 
# Update the [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Run Spreadsheet]
 
# Check ROOTSpy and compare plots with ....
 
# Check ROOTSpy and compare plots with ....
 
=== Important Notes: ===
 
#
 
 
 
==General Instructions==
 
 
 
 
===Establishing Physics Quality Beam for SRC/CT@GlueX:===
 
  
  
Line 136: Line 118:
 
*** In VNC or [XXXXXX Web Browser]
 
*** In VNC or [XXXXXX Web Browser]
 
** Strip charts
 
** Strip charts
 
 
* Monitor data quality
 
* Monitor data quality
 
* Communicate with the shift expert about issues with any of the above
 
* Communicate with the shift expert about issues with any of the above

Revision as of 12:20, 28 September 2021

SRC/CT@GlueX (E12-19-003) 2021 run, November-January



General Shift Information

Hall D Shift-Taker's Main Site

On-call List

  • Contact run coordinator if any problems during data taking: (757) 383-5542

Shift Schedule

Shift Sign-up

Shift-Taker's Checklist

Beam Time Accounting

Run Spreadsheet 2021

COO, ESAD, RSAD Things to read before shift.

[XXXXX Expert shift]

Remote worker shift - requirements and responsibilities

Analysis shift


JLab Logbooks


Short Term Schedule

SRC/CT@GlueX (E12-19-003) 2021 run, November-January'
Beam energy 10.7 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 8:45 am

Important instructions

* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.

NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!

* Please close any GUI that is not being used.

Run Plan November XXXX, 2021

  • Take production data: XXXX nA beam on the XXXX target, XXXX configuration, XXXX trigger XXXXX.trg. Each run should last about XXX hours.


Every Shift:

  1. Follow the run plan as outlined by RC
  2. With any issue contact On-Call Experts or RC
  3. Keep shift summary up to date in HDLOG. Record all that happens.
    • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment E12-19-003. . At the end of the shift send BTA to the logbook.
    • Fill and submit the shift checklist in the logbook

Every Run:

  1. After "Go":
  2. Update the Run Spreadsheet
  3. Check ROOTSpy and compare plots with ....


Long Term Schedule

RC daily meetings at 8:45 am in the Hall D conference room.

BlueJeans Info:

URL: https://bluejeans.com/XXXX

Meeting ID: XXXXXXX

SRC/CT@GlueX Full Run Plan



Remote Shifts

Overview

Tasks

  • Fill shift checklist
  • Upload plots to the Hall D logbook once per run
    •  ?????
  • Monitor beam quality
    • EPICS overview screen
      • In VNC or [XXXXXX Web Browser]
    • Strip charts
  • Monitor data quality
  • Communicate with the shift expert about issues with any of the above