Difference between revisions of "SRC/CT Good Run Selection"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
==RCDB==
 
==RCDB==
*
+
*Contact Sean Dobbs if we really need to edit the information in RCDB
  
 
==All runs==
 
==All runs==
Line 15: Line 15:
 
*RCDB query: "@is_src_production and @status_approved"
 
*RCDB query: "@is_src_production and @status_approved"
 
*[[SRC/CT approved runs | List of runs]]
 
*[[SRC/CT approved runs | List of runs]]
 +
*[[SRC/CT excluded runs | List of excluded runs and the reasons]]
  
  

Revision as of 12:52, 30 June 2022

RCDB

  • Contact Sean Dobbs if we really need to edit the information in RCDB

All runs

  • 90001 to 90662

Monitoring runs

  • Runs that are used in the monitoring launches. These runs are calibrated. Relatively loose selection so that some test runs and junk runs are also included.
  • RCDB query: "@is_src_production" (alias of "daq_run=='PHYSICS_SRC' and beam_current > 10. and event_count > 5000000 and solenoid_current > 100 and collimator_diameter != 'Blocking'")
  • List of runs
  • Quality check spreadsheet: monitoring ver 05

Approved runs


TBA: calibration or production target polarization