Difference between revisions of "SRC/CT Good Run Selection"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
*Runs that are used in the monitoring launches. These runs are calibrated. Relatively loose selection so that some test runs and junk runs are also included.
 
*Runs that are used in the monitoring launches. These runs are calibrated. Relatively loose selection so that some test runs and junk runs are also included.
 
*RCDB query: "@is_src_production" (alias of "daq_run=='PHYSICS_SRC' and beam_current > 10. and event_count > 5000000 and solenoid_current > 100 and collimator_diameter != 'Blocking'")
 
*RCDB query: "@is_src_production" (alias of "daq_run=='PHYSICS_SRC' and beam_current > 10. and event_count > 5000000 and solenoid_current > 100 and collimator_diameter != 'Blocking'")
*[[SRC/CT monitoring runs | List of runs]]
+
*[[SRC/CT monitoring runs | List of monitoring runs]]
 
*[https://docs.google.com/spreadsheets/d/1M3v9vpBmoHbHk0gjJHNsgAjq5bQL2UxcaRrUPeM4EaQ/edit#gid=1665922131 Quality check spreadsheet: monitoring ver 05]
 
*[https://docs.google.com/spreadsheets/d/1M3v9vpBmoHbHk0gjJHNsgAjq5bQL2UxcaRrUPeM4EaQ/edit#gid=1665922131 Quality check spreadsheet: monitoring ver 05]
 
*[https://docs.google.com/spreadsheets/d/1MA6vGl7-T3JHgxGfynUNVY1yVxVIn1RXKbEaVbNsWQ4/edit?usp=sharing Quality check spreadsheet: monitoring ver 06]
 
*[https://docs.google.com/spreadsheets/d/1MA6vGl7-T3JHgxGfynUNVY1yVxVIn1RXKbEaVbNsWQ4/edit?usp=sharing Quality check spreadsheet: monitoring ver 06]
Line 15: Line 15:
 
*Runs that are used in the reconstruction and analysis launches. Approved to be used in analysis after checking the calibration and data quality
 
*Runs that are used in the reconstruction and analysis launches. Approved to be used in analysis after checking the calibration and data quality
 
*RCDB query: "@is_src_production and @status_approved"
 
*RCDB query: "@is_src_production and @status_approved"
*[[SRC/CT approved runs | List of runs]]
+
*[[SRC/CT approved runs | List of approved runs]]
 
*[[SRC/CT excluded runs | List of excluded runs and the reasons]]
 
*[[SRC/CT excluded runs | List of excluded runs and the reasons]]
  

Revision as of 13:11, 1 July 2022

RCDB

  • Contact Sean Dobbs if we really need to edit the information in RCDB

All runs

  • 90001 to 90662

Monitoring runs

Approved runs


TBA: calibration or production target polarization