Difference between revisions of "Sep 10, 2015 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Action Items) |
||
Line 22: | Line 22: | ||
# Consider developing data structures for the peak value (Mike and Mark) | # Consider developing data structures for the peak value (Mike and Mark) | ||
# Provide information to Curtis' document on performance for FCAL (Matt) | # Provide information to Curtis' document on performance for FCAL (Matt) | ||
− | # Summarize information on eta peak (Will) | + | # Summarize information on eta peak (Will) [http://argus.phys.uregina.ca/gluex/DocDB/0028/002802/001/eta_peak_summary.pdf] |
# Produce plot of z-position resolution (George). | # Produce plot of z-position resolution (George). | ||
Revision as of 10:32, 10 September 2015
Contents
Video Conferencing Information
Meeting Time: 11 a.m.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Video-conference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Action Items
- Consider developing data structures for the peak value (Mike and Mark)
- Provide information to Curtis' document on performance for FCAL (Matt)
- Summarize information on eta peak (Will) [2]
- Produce plot of z-position resolution (George).
References
Tentative Agenda
- Announcements
- Action Items
- GlueX Collaboration Meeting October 8-10
- GlueX Performance document: BCAL & FCAL high-level plots GlueX-doc-2775
- Run preparations
- Solenoid cooldown and ramp up mid August
- FCAL Update
- BCAL Update
- Calorimetry F250 Firmware Discussions
- Reconstruction and Simulation
- Eta reconstruction (Tegan)
- Calibration
- Any other business
Minutes
Attendees: