Sep 15, 2008 Calorimetry

From GlueXWiki
Revision as of 14:03, 2 September 2008 by Elton (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")


Items for followup from Sep 2 calibration meeting

  1. Each subsystem must complete blanks in specification table.

Items for followup from Aug 18 meeting

  1. George: report on trip to Edmonton
  2. Estimates of pedestal width (electronic noise, etc.) for FM PMTs. The dark rate should be negligigle in this case.
  3. Resolution studies with up-to-date geometry (Blake) ONGOING
  4. Resolution studies with different segmentation for the outer section. - LOWER PRIORITY
  5. Add F100 rad hard glass to simulation. - Matt will do this
  6. Decision on Bcal sampling fraction needed by Sep. - Work by Stamatis (on vacation) will be summarized upon his return.

Documents to Review

  1. Please place documents here for review in advance of meeting
  2. Calibration-Monitoring
  3. Paul Smith's Fiber Pulser

Tentative Agenda

  1. Announcements
  2. Reports
  3. Updates
    • FCAL
    • BCAL
    • calibration
  4. Any other business

Minutes

Attending: