## Construction Status
 
## Construction Status
 
## Cosmic-ray normalization runs
 
## Cosmic-ray normalization runs
 +
## Brief update on SiPM tests
 
# Simulations
 
# Simulations
 
# Other Updates
 
# Other Updates

Revision as of 17:08, 1 September 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. Fcal
    • Elton and Ashot to meet and resolve any discrepancies between the simulations.
  3. Bcal
    • Report cosmic-ray normalization of energy conversion to photons.
  4. SiPM evaluations
    • UofR: Complete cosmic-ray energy calibration.
    • IU: a) take into account 5 times lower rate in upstream compared to downstream b) geometry for summed units
    • JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL
    1. Construction status
    2. To shashlyk or not to shashlyk.
  5. BCAL
    1. Construction Status
    2. Cosmic-ray normalization runs
    3. Brief update on SiPM tests
  6. Simulations
  7. Other Updates

Minutes

Attendees: