Difference between revisions of "Sep 2, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 40: Line 40:
  
 
''Attendees:
 
''Attendees:
 +
 +
# Announcements
 +
# Review of Action Items
 +
# Calibration
 +
# BCAL
 +
## Construction Status
 +
## Cosmic-ray normalization runs ([[Media:Cal_meet100902.pdf]])
 +
## Brief update on SiPM tests
 +
# Agenda for [[GlueX-Collaboration-Sep-2010]]
 +
# FCAL
 +
## Construction status
 +
## To shashlyk or not to shashlyk.
 +
# Simulations
 +
# Other Updates

Revision as of 13:32, 2 September 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. Fcal
    • Elton and Ashot to meet and resolve any discrepancies between the simulations.
  3. Bcal
    • Report cosmic-ray normalization of energy conversion to photons.
  4. SiPM evaluations
    • UofR: Complete cosmic-ray energy calibration.
    • IU: a) take into account 5 times lower rate in upstream compared to downstream b) geometry for summed units
    • JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. BCAL
    1. Construction Status
    2. Cosmic-ray normalization runs (Media:Cal_meet100902.pdf)
    3. Brief update on SiPM tests
  5. Agenda for GlueX-Collaboration-Sep-2010
  6. FCAL
    1. Construction status
    2. To shashlyk or not to shashlyk.
  7. Simulations
  8. Other Updates

Minutes

Attendees:

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. BCAL
    1. Construction Status
    2. Cosmic-ray normalization runs (Media:Cal_meet100902.pdf)
    3. Brief update on SiPM tests
  5. Agenda for GlueX-Collaboration-Sep-2010
  6. FCAL
    1. Construction status
    2. To shashlyk or not to shashlyk.
  7. Simulations
  8. Other Updates