Difference between revisions of "Sep 24, 2015 Calorimetry"

From GlueXWiki
Jump to: navigation, search
Line 39: Line 39:
 
# Reconstruction and Simulation
 
# Reconstruction and Simulation
 
# Calibration
 
# Calibration
## Coefficients (Andrei): [[Media:mu_decay_e_total.pdf]] and [[Media:mu_decay_e_cell.pdf]]
+
## Coefficients (Andrei): [[Media:mu_decay_e_total.pdf]] and [[Media:mu_decay_e_cell.pdf]] and [https://halldweb.jlab.org/wiki/images/f/f4/Mu_decay_e_total.pdf Muon Decay Total] and [https://halldweb.jlab.org/wiki/images/e/e2/Mu_decay_e_cell.pdf Muon Decay Cell]
 
## Event Tagging (Sean, all)
 
## Event Tagging (Sean, all)
 
# Any other business
 
# Any other business

Revision as of 23:21, 23 September 2015

Video Conferencing Information

Meeting Time: 11:15 a.m. (new time!)

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Action Items

  1. Consider developing data structures for the peak value (Mike and Mark)
  2. Produce plot of z-position resolution (George).

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book
  3. BCAL Action Items and Working Tasks

Tentative Agenda

  1. Announcements
  2. Action Items
  3. GlueX Collaboration Meeting October 8-10
  4. Commissioning
    1. FCAL Update
    2. BCAL Update
  5. Reconstruction and Simulation
  6. Calibration
    1. Coefficients (Andrei): Media:mu_decay_e_total.pdf and Media:mu_decay_e_cell.pdf and Muon Decay Total and Muon Decay Cell
    2. Event Tagging (Sean, all)
  7. Any other business

Minutes

Attendees: Simon, David, Mark (JLab), Sean (NWU), Christine (Athens), Curtis, Will M. (CMU), Andrei, Tegan, Ahmed, Zisis (Regina)"