Difference between revisions of "Sep 29, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Documents to Review)
Line 22: Line 22:
 
= Documents to Review=
 
= Documents to Review=
  
From Will Brooks: http://www.jlab.org/Hall-D/software/wiki/images/0/0c/Geometry_effect_timing.pdf
+
# From Will Brooks: http://www.jlab.org/Hall-D/software/wiki/images/0/0c/Geometry_effect_timing.pdf
 +
# Update on VLPCs [http://wanda/fiu.edu/goeglinw/downloads/Talks/D0_VLPC.pdf]
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 07:37, 26 September 2008

NEW TIME Time: 11:15 ET.

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Sep 2 calibration meeting

  1. Each subsystem must complete blanks in specification table.

Items for followup from Sep 15 meeting

  1. George: report on trip to Edmonton
  2. Decision on Bcal sampling fraction needed by Sep. - Initial work by Stamatis was reported
  3. Resolution studies (Blake)
    • Up-to-date geometry ONGOING.
    • Decreased threshold for FM pmts. ONGOING
    • Position resolution - understand dependence on granularity.
    • Different segmentation for the outer section. - LOWER PRIORITY
  4. Study impact of inactive material at the end of Bcal on acceptance.
  5. Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.

Documents to Review

  1. From Will Brooks: http://www.jlab.org/Hall-D/software/wiki/images/0/0c/Geometry_effect_timing.pdf
  2. Update on VLPCs [1]

Tentative Agenda

  1. Announcements
  2. Results on study of increased sampling in BCAL
  3. Status of simulation tasks

Minutes

Attending: