Difference between revisions of "Sep 29, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Items for followup from Sep 2 calibration meeting)
Line 8: Line 8:
  
 
= Items for followup from Sep 2 calibration meeting=
 
= Items for followup from Sep 2 calibration meeting=
# Each subsystem must complete blanks in specification table.
+
# Each subsystem must complete blanks in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Specification Table]].
 +
 
 
=Items for followup from Sep 15 meeting=
 
=Items for followup from Sep 15 meeting=
 
# George: report on trip to Edmonton
 
# George: report on trip to Edmonton

Revision as of 08:37, 29 September 2008

NEW TIME Time: 11:15 ET.

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Sep 2 calibration meeting

  1. Each subsystem must complete blanks in the Specification Table.

Items for followup from Sep 15 meeting

  1. George: report on trip to Edmonton
  2. Decision on Bcal sampling fraction needed by Sep. - Initial work by Stamatis was reported
  3. Resolution studies (Blake)
    • Up-to-date geometry ONGOING.
    • Decreased threshold for FM pmts. ONGOING
    • Position resolution - understand dependence on granularity.
    • Different segmentation for the outer section. - LOWER PRIORITY
  4. Study impact of inactive material at the end of Bcal on acceptance.
  5. Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.

Documents to Review

  1. From Will Brooks: http://www.jlab.org/Hall-D/software/wiki/images/0/0c/Geometry_effect_timing.pdf
  2. Update on VLPCs (Werner) [1]

Tentative Agenda

  1. Announcements
  2. Results on study of increased sampling in BCAL
  3. Bcal
  4. Fcal

Minutes

Attending: