Sep 29, 2008 Calorimetry

From GlueXWiki
Revision as of 14:02, 15 September 2008 by Elton (Talk | contribs) (Items for followup from Sep 15 meeting)

Jump to: navigation, search

NEW TIME Time: 11:15 ET.

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Sep 2 calibration meeting

  1. Each subsystem must complete blanks in specification table.

Items for followup from Sep 15 meeting

  1. George: report on trip to Edmonton
  2. Decision on Bcal sampling fraction needed by Sep. - Initial work by Stamatis was reported
  3. Resolution studies (Blake)
    • Up-to-date geometry ONGOING.
    • Decreased threshold for FM pmts. ONGOING
    • Position resolution - understand dependence on granularity.
    • Different segmentation for the outer section. - LOWER PRIORITY
  4. Study impact of inactive material at the end of Bcal on acceptance.
  5. Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Results on study of increased sampling in BCAL
  3. Status of simulation tasks

Minutes

Attending: