Difference between revisions of "Sep 29, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
Line 2: Line 2:
  
 
# Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
 
# Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
# Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs.
+
# <strike> Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs. <strike>
 
# Chris to check HV specs on coax cable. (Needs to hold at least 80 V).
 
# Chris to check HV specs on coax cable. (Needs to hold at least 80 V).
  
Line 25: Line 25:
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:
 +
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# SiPM testing (everyone)
 +
## Light source / optics
 +
## Electronic boards
 +
## Cabling
 +
## Cooling plate
 +
## Other?
 +
# Mechanical (Jim)
 +
# Mechanical drawings (Chuck)
 +
# Geometry (Elton)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Fernando)
 +
# Granularity (Elton)

Revision as of 16:34, 29 September 2011

Action Items from previous meetings

  1. Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
  2. Jack and Carl to review data sheets from Hamamatsu. Pick a couple of outlying samples for testing and checking against specs. <strike>
  3. Chris to check HV specs on coax cable. (Needs to hold at least 80 V).

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending:

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)