# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
# FCAL
 
## Notes from Matt: Excellent news on the CW front
 
##* Paul has a new reel of caps that hold voltage to 3 kV in air (leads soldered directly to to cap). 
 
##* Under the microscope these look better than old caps -- less "spikey stuff" on the metallization.
 
##* He fully assembled one multiplier board and powered it up to 2 kV.  It held 2 kV fine without any conformal coating.
 
 
# Calibration  
 
# Calibration  
 +
# FCAL
 +
## Construction status
 
# BCAL
 
# BCAL
 
## Construction Status
 
## Construction Status

Revision as of 11:46, 16 September 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. Fcal
    • Tim to check on magnetic checks of non-corrosion coated shield.
  3. SiPM decision
    • IU: geometry for summed units
    • JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL
    1. Construction status
  5. BCAL
    1. Construction Status
  6. SiPM update
  7. Simulations
  8. Other Updates

Minutes

Attendees: