(Minutes and Action Items)
 
(2 intermediate revisions by the same user not shown)
Line 12: Line 12:
 
*** Lead absorbers - drawings in review
 
*** Lead absorbers - drawings in review
 
*** assembly components - drawings in review
 
*** assembly components - drawings in review
** Stand All parts here - to be assembled in the TEDF High bay]
+
** Stand All parts here - to be assembled in the TEDF High bay [[image:cpp_stand_1.jpg|thumb]] [[image:cpp_stand_2.jpg|thumb]] [[image:cpp_stand_3.jpg|thumb]]
 
** Steel - all received [[image:cpp_steel_3.jpg|thumb]]
 
** Steel - all received [[image:cpp_steel_3.jpg|thumb]]
 
** Fcal platform mods
 
** Fcal platform mods
Line 29: Line 29:
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 
+
* Rory to bring 4 more chambers to JLAB end of Sept
 +
* Discussed microscope move - no new info
 +
* Plan to stack 2 chambers in EEL to check efficiency for the review recommendation
 +
* A second scintillator was added to the test setup
 +
* Elton and Albert are looking at the data
  
 
==Action Items ==
 
==Action Items ==

Latest revision as of 14:01, 21 October 2021

Meeting Time and Place

Thursday August 26, 2021, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I

Agenda

  • Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/August_26,_2021_CPP_Design_Meeting
  • Testing status - Beni
  • Design/Fab/Procurement status
    • Installation/assy 3D Model and dwgs
      • Lead absorbers - drawings in review
      • assembly components - drawings in review
    • Stand All parts here - to be assembled in the TEDF High bay
      Cpp stand 1.jpg
      Cpp stand 2.jpg
      Cpp stand 3.jpg
    • Steel - all received
      Cpp steel 3.jpg
    • Fcal platform mods
      • Cutouts complete
      • Floor Rails installed and aligned
        Cpp rails.jpg
  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage

Minutes and Action Items

  • Rory to bring 4 more chambers to JLAB end of Sept
  • Discussed microscope move - no new info
  • Plan to stack 2 chambers in EEL to check efficiency for the review recommendation
  • A second scintillator was added to the test setup
  • Elton and Albert are looking at the data

Action Items