Difference between revisions of "September 10, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday September 10, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom roo...")
 
(Agenda)
Line 19: Line 19:
 
# Optical box
 
# Optical box
 
#* Fabrication status update (Ernie and Jason)
 
#* Fabrication status update (Ernie and Jason)
#** Quartz window flange modification
+
#** Mirror cutting and installation: Delivery expected September 17 (Ernie)
#** Mirror cutting and installation
+
 
#** Dark box enclosure (Jason)
 
#** Dark box enclosure (Jason)
#* Plans for ESB and full installation
+
#** Quartz window (with modified flange) (Ernie)
 +
#* Updated installation schedule: [[https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf]]
 +
#* Planning for ESB
 
#** Mirror box laser alignment (Bill/Stephanie)
 
#** Mirror box laser alignment (Bill/Stephanie)
 
# DAQ integration
 
# DAQ integration
 +
#* Sasha/Ben successfully read out 2 modules with hits from the internal (to the board) pulser: [https://logbooks.jlab.org/entry/3594066 Logbook]
 +
#* David/Justin testing in EVIO parser offline
 +
# Slow controls
 +
#* Vanik is at JLab and working on voltage GUIs (HV/LV).  Scalers will follow.
 
# MAPMT testing  
 
# MAPMT testing  
 
#* Magnetic field test initial results (Bill and Andrew)
 
#* Magnetic field test initial results (Bill and Andrew)
Line 31: Line 36:
 
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
 
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
 
#* Time-based studies (Maria)
 
#* Time-based studies (Maria)
# Reminder: [[Addressing ERR review recommendations]]
+
# [[Addressing ERR review recommendations]]
 
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
 
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
 
# AOB
 
# AOB

Revision as of 12:22, 10 September 2018

Meeting Information

GlueX DIRC Meeting
Monday September 10, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Mirror cutting and installation: Delivery expected September 17 (Ernie)
      • Dark box enclosure (Jason)
      • Quartz window (with modified flange) (Ernie)
    • Updated installation schedule: [[2]]
    • Planning for ESB
      • Mirror box laser alignment (Bill/Stephanie)
  3. DAQ integration
    • Sasha/Ben successfully read out 2 modules with hits from the internal (to the board) pulser: Logbook
    • David/Justin testing in EVIO parser offline
  4. Slow controls
    • Vanik is at JLab and working on voltage GUIs (HV/LV). Scalers will follow.
  5. MAPMT testing
    • Magnetic field test initial results (Bill and Andrew)
  6. Software/simulations
    • Software overview and tasks (All)
    • Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
    • Time-based studies (Maria)
  7. Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
  8. AOB