Line 22: | Line 22: | ||
#** Dark box enclosure (Jason) | #** Dark box enclosure (Jason) | ||
#** Quartz window (with modified flange) (Ernie) | #** Quartz window (with modified flange) (Ernie) | ||
− | #* Updated installation schedule: | + | #* Updated installation schedule: [https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf] |
#* Planning for ESB | #* Planning for ESB | ||
− | #** Mirror box laser alignment (Bill/Stephanie) | + | #** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Sep_10_2018_laser_alignment.pdf Mirror box laser alignment] (Bill/Stephanie ) |
# DAQ integration | # DAQ integration | ||
#* Sasha/Ben successfully read out 2 modules with hits from the internal (to the board) pulser: [https://logbooks.jlab.org/entry/3594066 Logbook] | #* Sasha/Ben successfully read out 2 modules with hits from the internal (to the board) pulser: [https://logbooks.jlab.org/entry/3594066 Logbook] | ||
Line 31: | Line 31: | ||
#* Vanik is at JLab and working on voltage GUIs (HV/LV). Scalers will follow. | #* Vanik is at JLab and working on voltage GUIs (HV/LV). Scalers will follow. | ||
# MAPMT testing | # MAPMT testing | ||
− | #* Magnetic field test initial results (Bill and Andrew) | + | #* [https://halldweb.jlab.org/wiki/images/7/7c/9_10_mag_test_update.pdf Magnetic field test initial results] (Bill and Andrew) |
# Software/simulations | # Software/simulations | ||
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All) | #* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All) | ||
#* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie) | #* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie) | ||
+ | #** Individual bar dimensions implemented in HDDS | ||
+ | #** [https://github.com/JeffersonLab/hd_utilities/tree/master/dirc/alignment XML parser] written to make alignment adjustments: account for survey, rotations of optical/bar boxes, etc. | ||
#* Time-based studies (Maria) | #* Time-based studies (Maria) | ||
# [[Addressing ERR review recommendations]] | # [[Addressing ERR review recommendations]] | ||
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request) | #* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request) | ||
# AOB | # AOB |
Latest revision as of 12:52, 10 September 2018
Meeting Information
GlueX DIRC Meeting
Monday September 10, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Optical box
- Fabrication status update (Ernie and Jason)
- Mirror cutting and installation: Delivery to JLab expected September 17 (Ernie)
- Dark box enclosure (Jason)
- Quartz window (with modified flange) (Ernie)
- Updated installation schedule: [2]
- Planning for ESB
- Mirror box laser alignment (Bill/Stephanie )
- Fabrication status update (Ernie and Jason)
- DAQ integration
- Sasha/Ben successfully read out 2 modules with hits from the internal (to the board) pulser: Logbook
- David/Justin testing in EVIO parser offline
- Slow controls
- Vanik is at JLab and working on voltage GUIs (HV/LV). Scalers will follow.
- MAPMT testing
- Magnetic field test initial results (Bill and Andrew)
- Software/simulations
- Software overview and tasks (All)
- Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
- Individual bar dimensions implemented in HDDS
- XML parser written to make alignment adjustments: account for survey, rotations of optical/bar boxes, etc.
- Time-based studies (Maria)
- Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)