Difference between revisions of "September 13, 2013 Installation"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 36: Line 36:
 
#* Slow Control Installation
 
#* Slow Control Installation
 
#* Tagger Magnet Installation
 
#* Tagger Magnet Installation
#* BCAL Installation
+
#* BCAL Installation [http://gluex.phys.uregina.ca/content/photo/downstream-view-bcal-after-installation Downstream View], [http://gluex.phys.uregina.ca/content/photo/upstream-view-bcal-after-installation Upstream View], [http://gluex.phys.uregina.ca/content/photo/closeup-upstream-view-bcal-after-installation-four-support-strips-are-visible Closeup Upstream View]
 
#* FCAL Installation
 
#* FCAL Installation
 
#* FDC Installation
 
#* FDC Installation

Revision as of 10:36, 13 September 2013

Meeting Time and Place

Friday, September 13, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Desktop Sharing

You can view the computer desktop in the meeting room at JLab via the web.

  1. Go to http://esnet.readytalk.com
  2. In the "join a meeting" box enter the Hall D code: 3421244
  3. Fill in the participant registration form.

Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

Agenda

  1. Announcements
  2. Magnet Status
    • Impact of Magnet work on installation.
  3. Updates to the Mechanical Installation Schedule ( Sept Rendition of Install Schedule) (Tim)
  4. Electronics Installation Schedule (Fernando) [| Schedule]
  5. Installation Updates (Not a construction report)
    • Counting House Infracstructure
    • Trigger and DAQ Installation
    • Slow Control Installation
    • Tagger Magnet Installation
    • BCAL Installation Downstream View, Upstream View, Closeup Upstream View
    • FCAL Installation
    • FDC Installation
    • CDC Installation
    • TOF Installation
    • Start Counter Installation
    • Microscope Installation
    • Tagger Array Installation
    • Pair Spectrometer Installation
  6. A.O.B.

Minutes