Difference between revisions of "September 16, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
GlueX DIRC Meeting<br>
 
GlueX DIRC Meeting<br>
 
Monday September 16, 2019<br>
 
Monday September 16, 2019<br>
1:00 pm, EDT<br>
+
1:30 pm, EDT<br>
 
CC F326 <br>
 
CC F326 <br>
  
Line 17: Line 17:
  
 
# Announcements:
 
# Announcements:
#* New meeting time!
+
#* New meeting time: propose to meet at 1 pm for remainder of the Fall semester (based on updated availabilities).
#* [[GlueX-Collaboration-Oct-2019|Collaboration Meeting]]
+
#* [[GlueX-Collaboration-Oct-2019|Collaboration Meeting]] is in 2 weeks.  Should we reserve two presentations: Ongoing installation and Commissioning analysis?
 
# Installation work:
 
# Installation work:
 
#* South OB mirror replacement update
 
#* South OB mirror replacement update
 
#** Strongback modification and anodization (Stephanie, Mark)
 
#** Strongback modification and anodization (Stephanie, Mark)
#** Testing of epoxy larger glass panes (Tim)
+
#** [https://logbooks.jlab.org/entry/3731806 Testing of epoxy larger glass panes] (Tim, Keith)
 
#** Mirror and glass procurement and cutting (Mark, Tim)
 
#** Mirror and glass procurement and cutting (Mark, Tim)
 +
#*** [https://logbooks.jlab.org/entry/3731807 Test cut of top/bottom plate glass] (Mark)
 
#* North box installation progress (Mark, All)
 
#* North box installation progress (Mark, All)
 
#* Next steps (All)
 
#* Next steps (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 +
#* [https://github.com/JeffersonLab/HDGeant4/issues/121 Reflectivity issue on GitHub] (Yunjie, Justin)
 
#* Commissioning LUT analyses (All)
 
#* Commissioning LUT analyses (All)
 
#** Cherenkov ring fit (Roman)  
 
#** Cherenkov ring fit (Roman)  

Latest revision as of 11:37, 16 September 2019

Meeting Information

GlueX DIRC Meeting
Monday September 16, 2019
1:30 pm, EDT
CC F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
    • New meeting time: propose to meet at 1 pm for remainder of the Fall semester (based on updated availabilities).
    • Collaboration Meeting is in 2 weeks. Should we reserve two presentations: Ongoing installation and Commissioning analysis?
  2. Installation work:
  3. Spring 2019 DIRC Commissioning Analysis (All)
    • Reflectivity issue on GitHub (Yunjie, Justin)
    • Commissioning LUT analyses (All)
      • Cherenkov ring fit (Roman)
      • Commissioning Analyses Update (Ahmed)
    • Commissioning FastDIRC update (Yunjie)
  4. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  5. Software overview and tasks (All)
  6. AOB