Difference between revisions of "September 17, 2012 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 21: Line 21:
 
# Announcements
 
# Announcements
 
# The GlueX [[GlueX-Collaboration-Oct-2012|Collaboration Meeting]]
 
# The GlueX [[GlueX-Collaboration-Oct-2012|Collaboration Meeting]]
# Status of Hardware Designs in GEANT
+
# Status of Hardware Designs in GEANT (Matt)
# Status of Kinematic Fitting: [[Mattione_Update_09172012 | Paul]]
+
 
# Status of parameters for the proposed PID systems.
 
# Status of parameters for the proposed PID systems.
 +
# Status of Kinematic Fitting: [[Mattione_Update_09172012 | Paul]]
 
# AOT
 
# AOT
  
 
== Minutes ==
 
== Minutes ==

Revision as of 08:06, 17 September 2012

Meeting Time and Place

Monday September 17, 2012 at 1:30pm At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. ) EVO: A conference has been booked under "GlueX PID Upgrade" from 12:30pm until 4:00pm (EDT).
    1. ) To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 138802. Instructions for the
    2. )Phone Bridge to EVO.
    3. ) Skype Bridge to EVO
  3. )To connect by telephone, dial:
    1. ) You can look up toll-free number at http://www.readytalk.com/intl
    2. ) US and Canada: (866)740-1260 (toll free)
    3. ) International: (303)248-0285 (toll call)
    4. ) enter access code followed by the # sign: 3421244#

Agenda

  1. Announcements
  2. The GlueX Collaboration Meeting
  3. Status of Hardware Designs in GEANT (Matt)
  4. Status of parameters for the proposed PID systems.
  5. Status of Kinematic Fitting: Paul
  6. AOT

Minutes