Line 12: | Line 12: | ||
* FDC construction update - | * FDC construction update - | ||
* Upcoming work | * Upcoming work | ||
− | + | ** FCAL blocks - inspect one crate- complete | |
− | + | ** Trial assembly of BCAL wedges - lifting and support tooling being designed | |
− | + | ** Test PS magnet - elect. and water - Josh Ballard writing requirements | |
− | + | ** Split PS magnet - after testing | |
− | + | ** Modify PS magnet - when hardware available | |
− | + | ** Weld perm mag chambers - 2 ea - slava has dwgs | |
− | + | ** Weld DW magnet beam tube - Slava to define | |
− | + | ** Install perm and DW mags in collimator cave | |
− | + | ** Assemble and test BCAL readout prototype -complete | |
− | + | ** Drill/tap solenoid yokes in laydown area - fillers to be available in August | |
− | + | ** Help Beni with gass system assy/test in EEL 126 | |
− | + | ** Fabricate cable install mock up - John Conger currently designing | |
− | + | ** Cover trenches in Hall with plywood or cones for safety - complete | |
− | + | ** Install dehumidifiers in Hall D - complete | |
− | + | ** Camera mount in Hall | |
− | + | ** BCAL light guide gluing tests | |
− | + | ** Weld tests on solenoid baffles | |
== Open Action Items== | == Open Action Items== |
Latest revision as of 08:39, 2 September 2011
Meeting Time and Place
Friday Sept 2, 2011 at 9am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minute -
- Announcements -
- training -
- Manpower -
- Solenoid Test Status *
- FDC construction update -
- Upcoming work
- FCAL blocks - inspect one crate- complete
- Trial assembly of BCAL wedges - lifting and support tooling being designed
- Test PS magnet - elect. and water - Josh Ballard writing requirements
- Split PS magnet - after testing
- Modify PS magnet - when hardware available
- Weld perm mag chambers - 2 ea - slava has dwgs
- Weld DW magnet beam tube - Slava to define
- Install perm and DW mags in collimator cave
- Assemble and test BCAL readout prototype -complete
- Drill/tap solenoid yokes in laydown area - fillers to be available in August
- Help Beni with gass system assy/test in EEL 126
- Fabricate cable install mock up - John Conger currently designing
- Cover trenches in Hall with plywood or cones for safety - complete
- Install dehumidifiers in Hall D - complete
- Camera mount in Hall
- BCAL light guide gluing tests
- Weld tests on solenoid baffles
Open Action Items
New Action Items
- OSP for ceiling plates
Discussions
- In attendance Tim Whitlatch, S. Speigel, G. Humble, , B. Bunton, M. Stevens, S. Speigel, J. Thoamason, J. Foyles, C. Heck, T. Mann, M. Beizer, A. Johnson, T. Carstens