Difference between revisions of "September 23, 2011 Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Outstanding Action Items)
Line 28: Line 28:
 
* Change Design standards document to include Analysis designation (A001) - Chuck
 
* Change Design standards document to include Analysis designation (A001) - Chuck
 
* Update drawing check list to compare dwg and 3D model (any non-parametric dimensions)
 
* Update drawing check list to compare dwg and 3D model (any non-parametric dimensions)
* Post manpower assignments on M drive
+
* Post manpower assignments on M drive - Tim
  
 
==Minutes==
 
==Minutes==

Revision as of 07:49, 23 September 2011

Friday September 23, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • ESH&Q minute - Risk Codes
  • Announcements
    • Appraisals start next week
    • Raises likely 1-2% again
    • Collaboration meeting OCT 3
    • Lehman review Oct 20
    • Lab budget Month to month
    • training - up to date?
  • CAD update
  • Solenoid install Status - Josh
  • TOF/Start counter update
  • FDC construction update - Bill
  • Tagger Magnet/vacuum chamber
  • Target update
  • BCAL readout update
  • CDC update
  • Collimator beamline update
  • Mock up update - John
  • BCAL assy update
  • Fabrication/installation work - Tom

Outstanding Action Items

  • Change Design standards document to include Analysis designation (A001) - Chuck
  • Update drawing check list to compare dwg and 3D model (any non-parametric dimensions)
  • Post manpower assignments on M drive - Tim

Minutes

    • In attendance W. Crahen, J. Fochtman, V. Razmyslovich, J. Lagner, G. Biallas, R. Getz, W. Sachleben, Tim Whitlatch, J. Conger, C. Hutton