Difference between revisions of "September 24, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
# Announcements
 
# Announcements
 
#* Collaboration meeting this week
 
#* Collaboration meeting this week
 +
#* JLab management still deciding how to make up lost time this Fall:
 +
#**
 +
#**
 
# Optical box
 
# Optical box
 
#* Fabrication status update (Ernie and Jason)
 
#* Fabrication status update (Ernie and Jason)
#** Mirror box completion and delivery
+
#** Mirror box completion and delivery schedule (Ernie)
 
#** Dark box enclosure (Jason)
 
#** Dark box enclosure (Jason)
 
#** Quartz window (with modified flange) (Ernie)
 
#** Quartz window (with modified flange) (Ernie)
Line 29: Line 32:
 
#* 2 modules with internal pulser readout ([https://logbooks.jlab.org/entry/3594066 Logbook]) and successfully tested: [https://halldweb.jlab.org/wiki/images/7/70/DIRCParseEVIO.pdf parsed hit display]
 
#* 2 modules with internal pulser readout ([https://logbooks.jlab.org/entry/3594066 Logbook]) and successfully tested: [https://halldweb.jlab.org/wiki/images/7/70/DIRCParseEVIO.pdf parsed hit display]
 
# Slow controls
 
# Slow controls
#* Initial versions of voltage GUIs in place, scalers will follow.
+
#* Initial versions of voltage GUIs (from Vanik) in place and [https://halldweb.jlab.org/wiki/images/a/ab/Dirc_voltages.png functional]
 +
#* Scalers will follow.
 
# Software/simulations
 
# Software/simulations
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)
 
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All)

Revision as of 11:35, 24 September 2018

Meeting Information

GlueX DIRC Meeting
Monday September 24, 2018
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Collaboration meeting this week
    • JLab management still deciding how to make up lost time this Fall:
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Mirror box completion and delivery schedule (Ernie)
      • Dark box enclosure (Jason)
      • Quartz window (with modified flange) (Ernie)
    • Updated installation schedule: [2]
    • Testing in ESB
      • Mirror box laser alignment (Bill)
  3. DAQ integration
  4. Slow controls
    • Initial versions of voltage GUIs (from Vanik) in place and functional
    • Scalers will follow.
  5. Software/simulations
    • Software overview and tasks (All)
    • Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
      • Individual bar dimensions implemented in HDDS
      • XML parser written to make alignment adjustments: account for survey, rotations of optical/bar boxes, etc.
    • Time-based studies (Maria)
  6. Addressing ERR review recommendations
    • Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
  7. AOB