Difference between revisions of "September 25, 2013 tracking CDC/FDC"
From GlueXWiki
(→Hardware Agenda) |
(→Hardware Agenda) |
||
Line 20: | Line 20: | ||
# CDC Update | # CDC Update | ||
# Data Formats | # Data Formats | ||
− | # Cluster Counting Updates | + | # Cluster Counting Updates [http://www.jlab.org/Hall-D/detector/fdc/clucou/RawSignal6040.pdf], [http://www.jlab.org/Hall-D/detector/fdc/clucou/SingleTrack6040.pdf] |
# [[media:FDC_CDC_HV_LV.pdf | Voltage controls for FDC and CDC]] | # [[media:FDC_CDC_HV_LV.pdf | Voltage controls for FDC and CDC]] |
Revision as of 10:51, 25 September 2013
Meeting Time and Place
Wednesday September 25, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone, dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Hardware Agenda
- Announcement
- Collaboration Meeting
- FDC Update
- CDC Update
- Data Formats
- Cluster Counting Updates [1], [2]
- Voltage controls for FDC and CDC