September 25, 2019 FCAL Insert Design Meeting

From GlueXWiki
Revision as of 11:22, 30 September 2019 by Whitey (Talk | contribs) (Minutes and Action Items)

Jump to: navigation, search

Meeting Time and Place

Wednesday Sept 25 1:30 pm At Jefferson Lab, room TED 2504

  • Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernando, Chris Stanislav

Agenda

  • Action items from last meeting https://halldweb.jlab.org/wiki/index.php/September_9,_2019_FCAL_Insert_Design_Meeting#Agenda
  • Discuss Center tube
    • 1mm thick wall minimum. ID is 3.8 cm
    • Upstream end flush with upstream face of acrylic
  • Discuss Tungsten absorber
    • Cover 1.5 crystals ok?
    • Rohacell supported
  • Monitoring System
    • Use 1/2" Acrylic sheet with 45 degree angles on edges
    • How to attach fibers? Media:Acrylic_sheet.pdf
    • What size fibers?
    • Ok to make test piece as shown?
  • Cooling of blocks - 2.1 KW needed
    • 2 Chillers like those used for BCAL ($16K ea)
    • 4 water to air Heat exchangers around crystal area
    • 9 parallel circuits for each chiller
    • potted copper tube into aluminum blocks
    • Cooling of inner tube - removable plate
    • Proposed manifold similar to BCAL
  • Support structure and assy sequence
  • electronics patch panels DS of crystal pmts
  • Discussed Brazing of PMT module straps and new mag field tests
    • Sasha wishes to assemble a new 9 module array for magnetic field testing
      • 18mm diameter light guides are needed - josh found some on Amazon - tim will order
      • 6mm longer with 50 micron larger ID mag shield steel needed - Submitted to machine shop Media:1020_shield.pdf
      • additional mu metal shields needed (same as previous - 350 microns) - Tim ordered Due Oct 18-
      • Have steel shields annealed - Tim looking into it >900C
  • Discuss test fixture for PMTs in beam
    • Need to fabricate steel case - Media:Steel_shield.pdf
    • need to fabricate support structure - Tim
    • Need to fabricate feedthru panel - Josh/Tim
    • need to fabricated aluminum base plate - Josh/Tim

Minutes and Action Items

  • Inner Tube
    • ok to use 2mm wall
  • Acrylic Monitoring sheet
    • make 1/2" thick with 6mm bevel on outer edges only
    • Drill holes with diamond end mill for polished bottom
    • 1mm fiber probably ok
    • look at putting a rubber gasket on end flange of modules to prevent cross talk
    • make test piece Determine size to fit in dark box
  • Cooling Manifold
    • Need to make sure there is room to replace FCAL module electronics
    • Need humidity control in dark room
  • Electronics Patch Panels
    • Fernando informed us that a 48 wire cable will be used for HV
    • HV cables carries 48 individual wires, large bend radius Media:Radiall_connector.pdf
    • PCB mounted connector to bring power from Radiall to individual bases Media:SamtekHV.pdf
    • still need 1600 signal connectors on patch panel using same connectors as ComCal
    • Layout separate HV and signal patch panels - Keith

Action items