Difference between revisions of "September 26, 2017 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 19: Line 19:
 
# Support structure update (John)
 
# Support structure update (John)
 
#* Delivery and assembly plan
 
#* Delivery and assembly plan
 +
# Nitrogen system in Hall (Tom)
 
# Optical box
 
# Optical box
 
#* Water system delivery and assembly (Tim)
 
#* Water system delivery and assembly (Tim)
Line 27: Line 28:
 
#* Followup on dry run
 
#* Followup on dry run
 
#* 1st bar box shipment window: Oct 20 - Nov 15
 
#* 1st bar box shipment window: Oct 20 - Nov 15
# Nitrogen system in Hall (Tom)
 
 
# AOB
 
# AOB

Latest revision as of 12:57, 26 September 2017

Meeting Information

GlueX DIRC Meeting
Tuesday September 26, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John)
    • Delivery and assembly plan
  3. Nitrogen system in Hall (Tom)
  4. Optical box
    • Water system delivery and assembly (Tim)
    • Design and PMT mounting update (Ernie and Jason)
    • Simulation studies (Maria and Roman)
    • Electronics (Fernando)
  5. Bar box transportation and monitoring
    • Followup on dry run
    • 1st bar box shipment window: Oct 20 - Nov 15
  6. AOB