Difference between revisions of "September 3, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday September 3, 2019<br> 1:00 pm, EDT<br> Hall D Counting House <br> == Connection Using Bluejeans == # To join via Pol...") |
(→Agenda) |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
Tuesday September 3, 2019<br> | Tuesday September 3, 2019<br> | ||
1:00 pm, EDT<br> | 1:00 pm, EDT<br> | ||
− | + | CC F326 <br> | |
== Connection Using Bluejeans == | == Connection Using Bluejeans == | ||
Line 17: | Line 17: | ||
# Announcements: | # Announcements: | ||
+ | #* New meeting time? | ||
# Installation work: | # Installation work: | ||
− | #* South OB | + | #* South OB mirror replacement update |
− | # | + | #** Strongback modification and anodization (Stephanie, Mark) |
− | + | ||
#** "Sandwich" (rear surface) mirror option to protect reflective surface (current priority for testing) | #** "Sandwich" (rear surface) mirror option to protect reflective surface (current priority for testing) | ||
− | #*** | + | #*** [https://halldweb.jlab.org/DocDB/0041/004160/001/reflectivity_9.3.19.pdf Reflectivity measurement results] (Bill, Andrew, Justin, All) |
− | + | ||
− | + | ||
#** Deadline for decision on mirror replacement is September 5. Complete schedule from Tim after this date for installation before Fall run. | #** Deadline for decision on mirror replacement is September 5. Complete schedule from Tim after this date for installation before Fall run. | ||
− | #* North box installation progress ( | + | #* North box installation progress (Mark, All) |
− | + | ||
#* Next steps (All) | #* Next steps (All) | ||
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
#* Commissioning LUT analyses (All) | #* Commissioning LUT analyses (All) | ||
#** Cherenkov ring fit (Roman) | #** Cherenkov ring fit (Roman) | ||
− | #**[https:// | + | #** [https://www.dropbox.com/s/zfvslbyc0mf0521/presentation_3sep_2019.pdf?dl=0 Commissioning Analyses Update] (Ahmed) |
− | + | ||
− | + | ||
− | + | ||
#* Commissioning FastDIRC update (Yunjie) | #* Commissioning FastDIRC update (Yunjie) | ||
# Software/simulations | # Software/simulations |
Latest revision as of 12:59, 3 September 2019
Meeting Information
GlueX DIRC Meeting
Tuesday September 3, 2019
1:00 pm, EDT
CC F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- New meeting time?
- Installation work:
- South OB mirror replacement update
- Strongback modification and anodization (Stephanie, Mark)
- "Sandwich" (rear surface) mirror option to protect reflective surface (current priority for testing)
- Reflectivity measurement results (Bill, Andrew, Justin, All)
- Deadline for decision on mirror replacement is September 5. Complete schedule from Tim after this date for installation before Fall run.
- North box installation progress (Mark, All)
- Next steps (All)
- South OB mirror replacement update
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Commissioning Analyses Update (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- Commissioning LUT analyses (All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB